In AHERA, when is a Project Designer required for ACM removal in schools?

Explanation:
In AHERA, a Project Designer is required whenever asbestos removal work in a school exceeds a small threshold, specifically greater than 3 square feet of asbestos-containing material or greater than 3 linear feet of pipe insulation. This threshold ensures there is a formal abatement design in place that covers the scope, containment, engineering controls (like negative air pressure and HEPA filtration), waste handling, and worker protection before any removal begins. The other numbers listed (1, 10, or 50) do not match the official trigger; 3 square feet (or 3 linear feet on pipes) is the standard that determines when a Project Designer must be involved.

In AHERA, a Project Designer is required whenever asbestos removal work in a school exceeds a small threshold, specifically greater than 3 square feet of asbestos-containing material or greater than 3 linear feet of pipe insulation. This threshold ensures there is a formal abatement design in place that covers the scope, containment, engineering controls (like negative air pressure and HEPA filtration), waste handling, and worker protection before any removal begins. The other numbers listed (1, 10, or 50) do not match the official trigger; 3 square feet (or 3 linear feet on pipes) is the standard that determines when a Project Designer must be involved.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy